Our competences have been proven by numbers of projects in Russia and worldwide. Every successfully implemented case provided us with experience and made us better as professionals. These are the most challenging projects we faced during our working activity.
The highest safety class
Equipment of one of the most crucial system
Stringent quality requirements
Rostov NPP
Support of the Project on Reactor Coolant Pump Scroll supply for Rostov-4 Nuclear Power Plant. This task included the procedures of item manufacturing assistance and quality control.
Unmatched, unique equipment
Supercritical conditions
Documentation development from the scratch
Complicated complex of tests
Beloyarsk NPP
Supply of equipment for deaerator water supply system that have no equals in the world.
The system provide operation in the supercritical conditions for needs of Beloyarsk NPP with Power Units of BN-800 type.
During the Project implementation given the singularity of supplied equipment there was a necessity to develop all technical documentation from the scratch, elaborate a complicated complex of test procedures.
Hard Chinese regulatory requirements
Extreme operating conditions
Anti-corrosive material approval
Tainwan NPP
Supply of equipment for the needs of Tianwan NPP which required works on considering of both Russian and Chinese hard regulatory requirements.
There was a necessity to approve anti-corrosive material used for valves in view of extreme working fluid conditions (sea water).
Stringent environmental protection requirements
Combination of shipbuilding and nuclear energy requirements
Increased list of regulatory documents and facilities
Nuclear Icebreaker
Project 22220
Supply of nuclear icebreaker equipment for the needs of Rosatom. It is touted to become the world's biggest and the most powerful icebreaker. This Project required compliance with requirements of both nuclear energy and shipbuilding areas.
Resistance coefficient problems
Weight-size parameters problems
Original technical solution required
Import material selection and approval
Leningrad &
Novovoronezh
NPP
The Customer experienced a problem regarding resistance coefficients and weight-size parameters duringv implementation of the Project on DU-800 valves supply for Principal Valve Gate of Leningrad and Novovoronezh NPPs.
This issue required development of original technical solution. Import equipment supply required material selection (cast vessel, without cobalt cladding) and manufacturing tests for live steam pipeline sections of Main Steam Line.