We know how it works

Our competences have been proven by numbers of projects in Russia and worldwide. Every successfully implemented case provided us with experience and made us better as professionals. These are the most challenging projects we faced during our working activity.

The problem we had

PROJECTS

The services we did

The highest safety class

Equipment of one of the most crucial system

Stringent quality requirements

Rostov NPP

Support of the Project on Reactor Coolant Pump Scroll supply for Rostov-4 Nuclear Power Plant. This task included the procedures of item manufacturing assistance and quality control.




Unmatched, unique equipment

Supercritical conditions

Documentation development from the scratch

Complicated complex of tests

Beloyarsk NPP

Supply of equipment for deaerator water supply system that have no equals in the world.
The system provide operation in the supercritical conditions for needs of Beloyarsk NPP with Power Units of BN-800 type.
During the Project implementation given the singularity of supplied equipment there was a necessity to develop all technical documentation from the scratch, elaborate a complicated complex of test procedures.



Hard Chinese regulatory requirements

Extreme operating conditions

Anti-corrosive material approval

Tainwan NPP

Supply of equipment for the needs of Tianwan NPP which required works on considering of both Russian and Chinese hard regulatory requirements. 
There was a necessity to approve anti-corrosive material used for valves in view of extreme working fluid conditions (sea water).


Stringent environmental protection requirements

Combination of shipbuilding and nuclear energy requirements

Increased list of regulatory documents and facilities

Nuclear Icebreaker
Project 22220


Supply of nuclear icebreaker equipment for the needs of Rosatom. It is touted to become the world's biggest and the most powerful icebreaker. This Project required compliance with requirements of both nuclear energy and shipbuilding areas. 





Resistance coefficient problems

Weight-size parameters problems

Original technical solution required

Import material selection and approval

Leningrad &
Novovoronezh
NPP

The Customer experienced a problem regarding resistance coefficients and weight-size parameters duringv implementation of the Project on DU-800 valves supply for Principal Valve Gate of Leningrad and Novovoronezh NPPs.

This issue required development of original technical solution. Import equipment supply required material selection (cast vessel, without cobalt cladding) and manufacturing tests for live steam pipeline sections of Main Steam Line.