Technical Documentation & Calculation

Documentation for NPP project shall be developed according to Russian Unified System for Design Documentation and approved in an appropriate manner.

We develop technical and engineering documentation for NPP equipment providing the following:

Development and adaptation of calculation and engineering documents according to Russian standards;
Design and approval of Technical Requirements and Specifications (TU, TZ/TТ);
Development of test programs and methods;
Coordination of documentation with Russian regulatory bodies: Atomenergoproekt, Rosenergoatom, Rostechnadzor, etc.;
Development of operational documentation (operation manuals, instructions, etc.);
Full range of product calculations using finite element method (strength, hydro- and gasdynamic, noise, vibro- and seismic, etc.);
Development of Quality Control Tables.

Engineering

Sometimes exceptional operating and technical conditions determine an original solution of stated task.

We assist in developing and implementing tailor-made technical solutions for every project in accordance with particular customer requirements providing the following:

Participation in product development, identification of optimal solutions required for project implementation, analysis of its strengths and weaknesses;
Studies on possible solutions concerning complex engineering tasks.

Materials

Reconciliation of studies required by Russian standards is mandatory for any material used during the equipment manufacturing procedure.

We cover a wide range of issues on product materials providing the following:

Development of compliance rationale for applied materials (base and welding ones), testing standards and methods;
Assessment of specialists and welders according to Russian codes and standards;
Approval of used materials with Parent Material Organization;
Analysis of materials permitted for use.

Quality Assurance

One of key element regarding NPP equipment supply is to assure quality required by Russian codes and standards which might include the following:

Development and coordination of quality plans according to Russian Standards (RD 0713) and selection of Check Points optimum quantity and status;
Acceptance Inspection performance;
Studies on optimal product acceptance configuration;
Check Points presentation to the Authorized Organization.

Testing & Qualification

According to Russian Standards any equipment supplied for NPP shall be tested in an appropriate and
acceptable manner.

We entirely commit ourselves to deal with equipment tests providing the following:

Development of optimal test configuration;
All types of test management;
Commission meetings convening and management;
Execution of test reports and corresponding approvals by the Customer.

certification & Licensing

Obtaining of required certificates and licenses is a crucial part of project implementation in the field of nuclear energy.

We solve a wide array of issues providing the following:

Development of Quality Management System procedures for manufacturer's certification purposes;
Certification of Quality Management System according to Russian state standards;
Obtaining of turn-key certificates according to Russian standards;
Declaration of applications and intentions;
Obtaining of turn-key license.

Project support

Problems can arise during all stages of project implementation (from participation in tender to commissioning tests).

Providing project support during all stages of its implementation we find solutions for marketing, commercial and other tasks.

Document support of logistics processes;
Control over the performance of contractual responsibilities;
Risk analysis;
Competitive analysis;
Strategy development;
Analysis of market conditions;
Benchmarking.